| Bids Received on: 2008-07-17 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #4008 |
SIDEWALK RAMP IMPROVEMENT PROJECT - DISTRICT 3 |
|
Engineer's Estimate: $1,300,000 |
|
| Bidders for 4008 |
| Apparent Low Bidder |
| Maxistone Inc. DBA Maxicrete Inc. |
Fairfield, CA |
|
|
|
| # 2 Bidder |
| Sierra Nevada Construction, Inc. |
Sparks, NV |
|
|
|
| # 3 Bidder |
| FBD Vanguard Construction, Inc. |
Livermore, CA |
|
|
|
| # 4 Bidder |
| Nor-Cal Concrete Inc. |
Suisun, CA |
|
|
|
| # 5 Bidder |
| Granite Construction Company |
Watsonville, CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| Stripping |
Sierra Stripping |
Sacramento, CA |
| Electrical |
M&M Electrical |
Sacramento, CA |
| Slurry Seal |
CPM Pavement Maint. |
Sacramento, CA |
|
|
| Bids Received on: 2008-07-07 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #40222 |
Pugh House Demolition |
|
Engineer's Estimate: $41,100 |
|
| Bidders for 40222 |
| Apparent Low Bidder |
| G. W. Demolition |
Rio Linda CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| Asbestos Abatement |
CES Environmental |
Sacramento, CA |
| Well Abandoment |
Hedman Drilling |
Sacramento, CA |
|
|
| Bids Received on: 2008-07-03 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #40218 |
POPPY RIDGE COMMUNICATION TOWER |
|
Engineer's Estimate: $80,000 |
|
| Bidders for 40218 |
| Apparent Low Bidder |
| COMTECH COMMUNICATIONS, INC |
SACRAMENTO, CA. |
|
|
|
| # 2 Bidder |
| NSA WIRELESS |
SAN RAMON, CA |
|
|
|
| # 3 Bidder |
| John Callison Construction |
ELK GROVE, CA |
|
|
|
| # 4 Bidder |
| L G GENERAL CONTRACTORS, INC |
SACRAMENTO, CA |
|
|
|
| # 5 Bidder |
| TREELINE CONSTRUCTION, INC |
NAPA, CA |
|
|
|
| # 6 Bidder |
| MANUEL BRO., INC. A QUANTA SERVICES CO. |
GRASS VALLEY, CA |
|
|
|
| # 7 Bidder |
| COMMUNICATION BUILDING OF AMERICA, INC |
ANTIOCH, CA |
|
|
|
| # 8 Bidder |
| MORENO TRENCHING, LTD |
RIO VISTA, CA |
|
|
|
| # 9 Bidder |
| FOX LOOMIS, INC. |
SACRAMENTO, CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| Concrete Boring Asphalt Cutting |
Vickers |
Sacramento |
| Excavation and Paving |
Frank Ferreira |
Sacramento |
| Tower Fabrication |
Magnum Tower |
Sacramento |
|
|
| Bids Received on: 2008-06-26 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #3986 |
AC OVERLAY PROJECT FEDERAL SAFETEA-LU PHASE II |
|
Engineer's Estimate: $4,100,000 |
|
| Bidders for 3986 |
| Apparent Low Bidder |
| Teichert Construction |
Sacramento, CA |
| Base Bid Total |
$3,887,945 |
| Deductive Alternative A |
$348,403 |
| Deductive Alternative B |
$348,090 |
|
|
| # 2 Bidder |
| Vintage Paving Co. Inc. |
Winters, CA |
| Base Bid Total |
$4,244,305 |
| Deductive Alternative A |
$393,089.2 |
| Deductive Alternative B |
$351,758 |
|
|
| # 3 Bidder |
| Granite Construction Company |
Watsonville, CA |
| Base Bid Total |
$4,265,965 |
| Deductive Alternative A |
$394,578.8 |
| Deductive Alternative B |
$354,071 |
|
|
| # 4 Bidder |
| Central Valley Engineering & Asphalt, Inc. |
Roseville, CA |
| Base Bid Total |
$4,719,025 |
| Deductive Alternative A |
$441,152.4 |
| Deductive Alternative B |
$366,273.6 |
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| Loop Work (partial) |
M&M Electric |
Sacramento, CA |
| Striping/Markers |
Centerline Striping |
Elk Grove, CA |
| Wedge Grinding |
Anrak Corp. |
Sacramento, CA |
| Slurry Seal |
CPM |
Sacramento, CA |
|
|
| Bids Received on: 2008-06-18 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #40221 |
GIBSON RANCH HOUSE LANDSCAPE IMPROVEMENTS PROJECT |
|
Engineer's Estimate: $46,400 |
|
| Bidders for 40221 |
| Apparent Low Bidder |
| Abide Builders, Inc. |
Sacramento, CA |
|
|
|
| # 2 Bidder |
| Cal Sierra Construction, Inc. |
Carmichael, Ca |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| Masonry |
Tanner Masonry |
Rancho Cordova, CA |
|
|
| Bids Received on: 2008-06-05 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #4006 |
NATOMAS CROSS CANAL SOUTH LEVEE PHASE 1B IMPROVEMENT PROJECT, SUTTER COUNTY, CA |
|
Engineer's Estimate: $5,500,000 |
|
| Bidders for 4006 |
| Apparent Low Bidder |
| Environcon, Inc. DAB Paradigm Environmental |
Roseville, CA |
|
|
|
| # 2 Bidder |
| Mountain Cascade Inc. |
Livermore, CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| Surveying Services |
Muir Consulting |
Oakdale, CA |
| Geotechnical Testing |
Vector Engineering |
Grass Valley, CA |
| Hydroseeding |
Greenscape |
Roseville, CA |
| Earthwork |
Teichert Construction |
Davis, CA |
|
|
| Bids Received on: 2008-05-29 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #3857 |
SOUTH WATT AVENUE WIDENING PROJECT, JACKSON ROAD TO KIEFER BOULEVARD |
|
Engineer's Estimate: $4,600,000 |
|
| Bidders for 3857 |
| Apparent Low Bidder |
| Sierra Nevada Construction Inc. |
Sparks, NV |
| Base Bid + Bid Alternative "A" |
$4,224,007 |
|
|
| # 2 Bidder |
| DeSliva Gates Construction, LP |
Dublin, CA |
| Base Bid + Bid Alternative "A" |
$4,293,912.75 |
|
|
| # 3 Bidder |
| Western Engineering Contractors, Inc. |
Loomis, CA |
| Base Bid + Bid Alternative "A" |
$4,456,163.59 |
|
|
| # 4 Bidder |
| Teichert Construction |
Sacramento, CA |
| Base Bid + Bid Alternative "A" |
$4,501,216.62 |
|
|
| # 5 Bidder |
| Granite Constructiion Company |
Watsonville, CA |
| Base Bid + Bid Alternative "A" |
$4,505,505 |
|
|
| # 6 Bidder |
| The Beebe Corporation |
Sacramento, CA |
| Base Bid + Bid Alternative "A" |
$4,854,547.21 |
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| Demo/Clearing |
W.C. Maloney |
Stockton, CA |
| Fencing/Steel |
Pisor Fence |
Citrus Heights, Ca |
| Concrete |
Nor-Cal Concrete |
Suisun, CA |
| Landscape/Irrigation |
Valley Crest Landscape |
Sacramento, CA |
| Painting |
Hanson Painting & Decorating |
Sacramento, CA |
| Pavers |
Earth Shelter Developers |
Lodi, CA |
| Block Walls |
PTS Masonry |
Sacramento, CA |
| Underground |
D.A. Wood Construction |
Empire, CA |
| Electrical |
Richard A Heaps Elec. Cont. |
Sacramento, CA |
| Striping |
Centerline Striping |
Elk Grove, CA |
|
|
| Contract #3998 |
SACRAMENTO INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM REMOTE PARKING LOT |
|
Engineer's Estimate: $15,300,000 |
|
| Bidders for 3998 |
| Apparent Low Bidder |
| DeSilva Gates Construction |
Sacramento, CA |
| Total Bid: Subtotal A Plus Subtotal B Plus Subtotal C |
$8,384,142.05 |
|
|
| # 2 Bidder |
| Teichert Construction |
Sacramento, CA |
| Total Bid: Subtotal A Plus Subtotal B Plus Subtotal C |
$8,768,454 |
|
|
| # 3 Bidder |
| Granite Construction Company |
Watsonville, CA |
| Total Bid: Subtotal A Plus Subtotal B Plus Subtotal C |
$8,771,483.98 |
|
|
| # 4 Bidder |
| Flintco, Inc. |
Folsom, CA |
| Total Bid: Subtotal A Plus Subtotal B Plus Subtotal C |
$8,966,710 |
|
|
| # 5 Bidder |
| Top Grade Construction, Inc. |
Stockton, CA |
| Total Bid: Subtotal A Plus Subtotal B Plus Subtotal C |
$9,130,997.67 |
|
|
| # 6 Bidder |
| Western Engineering Contractors, Inc. |
Loomis, CA |
| Total Bid: Subtotal A Plus Subtotal B Plus Subtotal C |
$9,362,419.52 |
|
|
| # 7 Bidder |
| Sierra Nevada Construction, Inc. |
Sparks, NV |
| Total Bid: Subtotal A Plus Subtotal B Plus Subtotal C |
$9,377,014 |
|
|
| # 8 Bidder |
| McGuire and Hester |
Oakland, CA |
| Total Bid: Subtotal A Plus Subtotal B Plus Subtotal C |
$10,208,055.6 |
|
|
| # 9 Bidder |
| Baldwin Contracting Company, Inc. |
Chico, CA |
| Total Bid: Subtotal A Plus Subtotal B Plus Subtotal C |
$12,187,173.59 |
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| Fencing |
Pisor Fence Division Inc. |
Citrus Heights, CA |
| Concrete |
Slipform Concrete |
Sacramento, CA |
| Signs & Striping |
Bayside Stripe and Seal |
Petaluma, CA |
| Chip Seal |
CPM |
Sacramento, CA |
| Storm Drain |
Preston Pipeline |
Sacramento, CA |
| Landscaping |
East Bay Construction |
Livermore, CA |
| Electrical |
Steiny & Co. |
Vallejo, CA |
|
|
| Bids Received on: 2008-05-27 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #40219 |
MATHER BIKE TRAIL OVERLAY - PHASE I |
|
Engineer's Estimate: $90,800 |
|
| Bidders for 40219 |
| Apparent Low Bidder |
| All Phase Construction |
Roseville, CA |
|
|
|
| # 2 Bidder |
| Central Valley Engineering & Asphalt, Inc |
Roseville, CA |
|
|
|
| # 3 Bidder |
| Martin General Engineering, Inc. |
Rancho Cordova, CA |
|
|
|
| # 4 Bidder |
| Biondi Paving, Inc. |
Sacramento, CA |
|
|
|
| # 5 Bidder |
| Cal Sierra Construction, Inc. |
Carmichael, CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| Tractor Owner Operator |
Shane Thomas |
Forest Hill, CA |
| Striping/Markings |
Sierra Striping |
Sacramento, CA |
|
|
| Bids Received on: 2008-05-22 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #4002 |
INTERSECTION IMPROVEMENTS FOR DISABLED ACCESS OXAZ - PHASE 3 |
|
Engineer's Estimate: $570,000 |
|
| Bidders for 4002 |
| Apparent Low Bidder |
| C & C Construction, Inc. |
Rocklin, CA |
|
|
|
| # 2 Bidder |
| Martin General Engineering, Inc. |
Rancho Cordova, CA |
|
|
|
| # 3 Bidder |
| Granite Construction Company |
Watsonville, CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| Electrical |
Republic ITS |
Sacramento, CA |
| Striping/Signage |
Chrisp |
Stockton, CA |
| Slurry Seal |
CPM |
Sacramento, CA |
| Paving/Grinding |
James Riolo |
Roseville, CA |
|
|
| Bids Received on: 2008-05-15 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #3996 |
SACRAMENTO INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM REMOTE CENTRAL RECEIVING FACILITY |
|
Engineer's Estimate: $8,245,848 |
|
| Bidders for 3996 |
| Apparent Low Bidder |
| Tricorp Construction, Inc. |
Sacramento, CA |
|
|
|
| # 2 Bidder |
| McCarthy Construction |
Sacramento, CA |
|
|
|
| # 3 Bidder |
| Flintco, Inc. |
Folsom, CA |
|
|
|
| # 4 Bidder |
| John F. Otto, Inc. dba Otto Construction |
Sacramento, CA |
|
|
|
| # 5 Bidder |
| Allen L. Bender, Inc. |
West Sacramento, CA |
|
|
|
| # 6 Bidder |
| Hilbers Inc. |
Yuba City, CA |
|
|
|
| # 7 Bidder |
| JMR Construction Corp |
Folsom , CA |
|
|
|
| # 8 Bidder |
| L.M. Combs Construction, Inc. |
Cameron Park, CA |
|
|
|
| # 9 Bidder |
| Diede Construction, Inc. |
Woodbridge, CA |
|
|
|
| # 10 Bidder |
| Carter-Kelly, Inc. |
Placerville, CA |
|
|
|
| # 11 Bidder |
| C & C Construction Inc. |
Rocklin, CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| Sitework |
WL Freigen |
Stockton, CA |
| Fences |
Crusader Fence |
Rancho Cordova, CA |
| Landscape |
Excel Landscaping |
Sacramento, CA |
| Rebar |
Smith Steel Services |
Sacramento, CA |
| Concrete |
CVC |
Rancho Cordova, CA |
| Pre-Cast Concrete |
Clark Pacific |
West Sacramento, CA |
| Steel & Misc. Metals |
CT Welding |
Newcastle, CA |
| Roofing |
C.E.I. |
Rancho Cordova, CA |
| Metal Panels |
DKM |
Loomis, CA |
| Storefront |
Architectual Glass |
Vacaville, CA |
| Drywall |
Reyes |
Roseville, CA |
| Painting |
RT Painting |
Rocklin, CA |
| Mtl Building |
Cranston Steel Structures |
Woodland, CA |
| Cold Storage |
Ingersoll Rand |
Sacramento, CA |
| Fire Sprinklers |
American |
Rio Linda, CA |
| Plumbing |
Cayler |
Orangevale, CA |
| HVAC/Controls |
DKM |
Loomis, CA |
| Electrical |
Davis Electric |
Rancho Cordova, CA |
| Fire Alarm |
Davis Electric |
Rancho Cordova, CA |
| Security |
Davis Electric |
Rancho Cordova, CA |
| Tele/Data |
Davis Electric |
Rancho Cordova, CA |
|
|
| Bids Received on: 2008-05-08 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #3993 |
CYPRESS AVENUE @ GARFIELD AVENUE TRAFFIC SIGNAL INSTALLATION PROJECT - FEDERAL AID PROJECT 03-SAC-0-CR HSIPL-5924 (148) |
|
Engineer's Estimate: $600,000 |
|
| Bidders for 3993 |
| Apparent Low Bidder |
| MAY-HAN-ELECTRIC INC. DBA M & M ELECTRIC |
SACRAMENTO, CA |
|
|
|
| # 2 Bidder |
| TIM PAXIN'S PACIFIC EXCAVATION, INC |
ELK GROVE, CA |
|
|
|
| # 3 Bidder |
| RICHARD A HEAPS ELECTRICAL CONTRACTOR, INC |
SACRAMENTO, CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| SLURRY SEAL |
CPM |
SACRAMENTO, CA |
| CONCRETE/ROARDWORD |
ALLIED WEST CONST |
PENRYN, CA |
| SIGNING & STRIPING |
CENTERLINE STRIPING |
ELK GROVE, CA |
|
|
| Contract #3995 |
COUNTYWIDE SIDEWALK CONTINUITY PROJECT - PHASE 2B - FEDERAL AID PROJECT DFDA-14.218 |
|
Engineer's Estimate: $2,050,000 |
|
| Bidders for 3995 |
| Apparent Low Bidder |
| SIERRA NATIONAL CONSTRUCTION, INC |
CARMICHAEL, CA |
| TOTAL AMOUNT OF BID |
$1,692,298.55 |
|
|
| # 2 Bidder |
| C & C CONSTRUCTION, INC |
ROCKLIN, CA |
| TOTAL AMOUNT OF BID |
$1,783,306.05 |
|
|
| # 3 Bidder |
| MAXISTONE, INC DBA MAXICRETE, INC |
FAIRFIELD, CA |
| TOTAL AMOUNT OF BID |
$1,783,570.08 |
|
|
| # 4 Bidder |
| GRANITE CONSTRUCTION CO |
WATSONVILLE, CA |
| TOTAL AMOUNT OF BID |
$1,926,722 |
|
|
| # 5 Bidder |
| VANGUARD CONSTRUCTION |
LIVERMORE, CA |
| TOTAL AMOUNT OF BID |
$2,335,436.3 |
|
|
| # 6 Bidder |
| CENTRAL VALLEY ENGINEERING & ASPHALT, INC |
ROSEVILLE, CA |
| TOTAL AMOUNT OF BID |
$2,336,416.15 |
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| ELECTRICAL |
M & M |
SACRAMENTO, CA |
| STRIPING |
CHRISP CO |
FREMONT, CA |
| SLURRY SEAL |
CTM |
SACRAMENTO, CA |
| RETAINING WALL |
STRAIGHTLINE |
GOLD RIVER, CA |
|
|
| Bids Received on: 2008-05-01 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #3977 |
BRADSHAW ROAD WIDENING PROJECT- CALVINE ROAD TO FLORIN ROAD |
|
Engineer's Estimate: $21,353,000 |
|
| Bidders for 3977 |
| Apparent Low Bidder |
| George Reed Inc. |
Lodi , CA |
|
|
|
| # 2 Bidder |
| Sierra Nevada Construction, Inc. |
Sparks, NV |
|
|
|
| # 3 Bidder |
| Teichert Construction |
Sacramento, CA |
|
|
|
| # 4 Bidder |
| Desilva Gates Construction, LP |
Dublin, CA |
|
|
|
| # 5 Bidder |
| Granite Construction |
Watsonville, CA |
|
|
|
| # 6 Bidder |
| McGurie and Hester |
Oakland, CA |
|
|
|
| # 7 Bidder |
| RGW Construction Inc. |
Livermore, CA |
|
|
|
| # 8 Bidder |
| St Louis Construction, Inc. |
Rockville, MN. |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| landscaping |
Emert |
Stockon |
| underground |
Marquez |
Sacramento |
| electrical |
Pacific Excavating |
Elk Grove |
| masonry walls |
PTS Masonary |
Saramento |
| striping and markers |
Chrisp |
Fremont |
| fencing |
Crusader |
Rancho Cordova |
| bridge |
R&R Construction |
Sacramento |
| demolition |
WC Maloney |
Stockton Port |
|
|
| Bids Received on: 2008-04-10 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #3972 |
Q STREET / RIO LINDA BLVD STORM DRAIN IMPROVEMENT PROJECT |
|
Engineer's Estimate: $730,000 |
|
| Bidders for 3972 |
| Apparent Low Bidder |
| NORTH STAR CONSTRUCTION AND ENGINEERING, INC. |
YUBA CITY, CA |
|
|
|
| # 2 Bidder |
| L.R. GOMEZ CONSTRUCTION |
DIXON, CA |
|
|
|
| # 3 Bidder |
| BRC CONSTRUCTION INC. |
ELVERTA, CA |
|
|
|
| # 4 Bidder |
| LUND CONSTRUCTION |
NORTH HIGHLANDS, CA |
|
|
|
| # 5 Bidder |
| CAL SIERRA CONSTRUCTION, INC. |
CARMICHAEL, CA |
|
|
|
| # 6 Bidder |
| THE BEEBE CORPORATION |
SACRAMENTO, CA |
|
|
|
| # 7 Bidder |
| C & D CONTRACTORS, INC. |
NEVADA CITY, CA |
|
|
|
| # 8 Bidder |
| PRESTON PIPELINES, INC. |
MILPITAS, CA |
|
|
|
| # 9 Bidder |
| ARGONAUT CONSTRUCTORS |
SANTA ROSA, CA |
|
|
|
| # 10 Bidder |
| DELTA EXCAVATING INC. |
ANTIOCH, CA |
|
|
|
| # 11 Bidder |
| SIERRA NATIONAL CONSTRUCTION, DBA J R S GENERAL ENGINEERING |
CARMICHAEL |
|
|
|
| # 12 Bidder |
| LORANG BROTHERS CONSTRUCTION, INC. |
COLFAX, CA |
|
|
|
| # 13 Bidder |
| L.L. CHRISTIAN CONSTRUCTION, INC. |
EL DORADO HILLS, CA |
|
|
|
| # 14 Bidder |
| JJM ENGINEERING CONSTRUCTORS, INC. |
SACRAMENTO, CA |
|
|
|
| # 15 Bidder |
| AMERICAN ENGINEERING & ASPHALT, INC. |
ROCKLIN, CA |
|
|
|
| # 16 Bidder |
| TEICHERT CONSTRUCTION |
SACRAMENTO, CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| SAW CUTTING |
CAL WEST CONCRETE CUTTING, INC. |
YUBA CITY, CA |
|
|
| Bids Received on: 2008-03-27 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #3954 |
MADISON AVENUE MEDIAN LANDSCAPING |
|
Engineer's Estimate: $800,000 |
|
| Bidders for 3954 |
| Apparent Low Bidder |
| SIERRA NATIONAL CONSTRUCTION, INC. DBA J R S GENERAL ENGINEERING |
CARMICHAEL, CA |
| TOTAL BASE BID |
$712,589.24 |
| TOTAL BID ALTERNATE A |
$50,733 |
| TOTAL BID ALTERNATE A DEDUCT ITEMS |
$10,000 |
| TOTAL BID ALTERNATE B |
$40,352 |
| TOTAL BID ALTERNATE B DEDUCT ITEMS |
$2,745 |
| TOTAL BID ALTERNATE C |
$46,399 |
| TOTAL BASE BID + ALTERNATES A, B & C |
$837,328.24 |
|
|
| # 2 Bidder |
| GOLD VALLEY CONSTRUCTION |
ROCKLIN, CA |
| TOTAL BASE BID |
$720,719.9 |
| TOTAL BID ALTERNATE A |
$50,624 |
| TOTAL BID ALTERNATE DEDUCT ITEMS |
$6,000 |
| TOTAL BID ALTERNATE B |
$51,590.2 |
| TOTAL BID ALTERNATE B DEDUCT ITEMS |
$1,525 |
| TOTAL BID ALTERNATE C |
$55,673.9 |
| TOTAL BASE BID + ALTERNATES A, B & C |
$871,083 |
|
|
| # 3 Bidder |
| COOK GENERAL ENGINEERING, INC |
RANCHO CORDOVA, CA |
| TOTAL BASE BID |
$997,898.8 |
| TOTAL BID ALTERNATE A |
$35,514 |
| TOTAL BID ALTERNATE A DEDUCT ITEMS |
$14,800 |
| TOTAL BID ALTERNATE B |
$65,062.8 |
| TOTAL BID ALTERNATE B DEDUCT ITEMS |
$3,660 |
| TOTAL BID ALTERNATE C |
$71,681.6 |
| TOTAL BASE BID + ALTERNATES A, B & C |
$1,151,697.2 |
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| TRAFFIC SIGNAL |
RICHARD HEAPS |
SACRAMENTO, CA |
| STAMPED AC |
COOK ENGINEERING |
RANCHO CORDOVA, CA |
| LANDSCAPE |
AERCO PACIFIC |
RANCHO CORDOVA, CA |
| CRASH GUARD |
TRAFFIC CONTROL SVC |
SACRAMENTO, CA |
|
|
| Contract #3989 |
PATRIOTS PARK |
|
Engineer's Estimate: $969,088 |
|
| Bidders for 3989 |
| Apparent Low Bidder |
| STAR CONST. INC. |
SAN BRUNO, CA |
|
|
|
| # 2 Bidder |
| BRC CONSTRUCTION INC. |
ELVERTA, CA |
|
|
|
| # 3 Bidder |
| HEMINGTON LANDSCAPE SERVICES, INC. |
CAMERON PARK, CA |
|
|
|
| # 4 Bidder |
| GATEWAY LANDSCAPE CONSTRUCTION, INC |
LIVERMORE, CA |
|
|
|
| # 5 Bidder |
| PARKER LANDSCAPE DEV. INC. |
SACRAMENTO, CA |
|
|
|
| # 6 Bidder |
| MAXISTONE INC. DBA MAXICRETE INC. |
FAIRFIELD, CA |
|
|
|
| # 7 Bidder |
| GOLD VALLEY CONSTRUCTION INC. |
ROCKLIN, CA |
|
|
|
| # 8 Bidder |
| JM SLOVER INC. |
PLACERVILLE, CA |
|
|
|
| # 9 Bidder |
| ODYSSEY LANDSCAPE CO., INC. |
STOCKTON, CA |
|
|
|
| # 10 Bidder |
| ELITE LANDSCAPING, INC. |
CLOVIS, CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| SURVEYING |
CENTER POINT ENG INC. |
ROSEVILLE, CA |
| INSTALL PLAY EQUIP |
CREEKMORE RECREATION |
CARMICHAEL, CA |
| GRADING & UNDERGROUND |
R. DAWSON CONST. INC. |
FAIRFIELD, CA |
| ELECTRICAL |
GRAY ELECTRIC |
GRASS VALLEY |
|
|
| Contract #3992 |
WILEY WETLAND PRESERVE PROJECT |
|
Engineer's Estimate: $6,233,000 |
|
| Bidders for 3992 |
| Apparent Low Bidder |
| WESTERN ENGINEERING CONTRACTORS, INC. |
LOOMIS, CA |
|
|
|
| # 2 Bidder |
| INDEPENDENT CONSTRUCTION CO. |
SACRAMENTO, CA |
|
|
|
| # 3 Bidder |
| SIERRA EQUIPMENT RENTAL, INC. |
GLENN, CA |
|
|
|
| # 4 Bidder |
| A TEICHERT & SON INC. DBA TEICHERT |
DAVIS, CA |
|
|
|
| # 5 Bidder |
| AD LAND VENTURE |
RANCHO CORDOVA, CA |
|
|
|
| # 6 Bidder |
| ODYSSEY LANDSCAPE CO., INC. |
STOCKTON, CA |
|
|
|
| # 7 Bidder |
| MAGGIORA & GHILOTTI INC. |
SAN RAFAEL, CA |
|
|
|
| # 8 Bidder |
| ENVIROCON, INC. DBA PARADIGM ENVIRONMENTAL |
ROSEVILLE, CA |
|
|
|
| # 9 Bidder |
| NORDIC INDUSTRIES, INC. |
OLIVEHURST, CA |
|
|
|
| # 10 Bidder |
| SIERRA NATIONAL CONSTRUCTION, INC. |
CARMICHAEL, CA |
|
|
|
| # 11 Bidder |
| WOOD BROS. INC. |
LEMOORE, CA |
|
|
|
| # 12 Bidder |
| DOUG VEERKAMP GENERAL ENGINEERING, INC. |
PLACERVILLE, CA |
|
|
|
| # 13 Bidder |
| NORTH STAR CONSTRUCTION AND ENGINEERING, INC. |
YUBA CITY, CA |
|
|
|
| # 14 Bidder |
| PHILLIPS AND JORDAN, INCORPORATED |
REDLANDS, CA |
|
|
|
| # 15 Bidder |
| ARGONAUT CONSTRUCTORS |
SANTA ROSA, CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| LANDSCAPE/MAINTENANCE |
PACIFIC PARKS LANDSCAPING |
LOOMIS, CA |
| FENCE |
CENTRAL FENCE CO. |
SACRAMENTO, CA |
| WELL |
EATON DRILLING CO. |
WOODLAND, CA |
| ELECTRICAL |
GRAY ELECTRIC CO. |
GRASS VALLEY, CA |
|
|
| Bids Received on: 2008-03-20 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #3976 |
WATERMAN ROAD IMPROVEMENT PROJECT - CALVINE TO VINTAGE PARK DR |
|
Engineer's Estimate: $1,350,000 |
|
| Bidders for 3976 |
| Apparent Low Bidder |
| SIERRA NATIONAL CONSTRUCTION, INC. DBA J R S GENERAL ENGINEERING |
CARMICHAEL, CA |
| BASE BID + ALTERNATIVE A |
$1,207,494.84 |
|
|
| # 2 Bidder |
| WESTERN ENGINEERING CONTRACTORS, INC. |
LOOMIS, CA |
| BASE BID + ALTERNATIVE A |
$1,254,808.28 |
|
|
| # 3 Bidder |
| GOLD VALLEY CONST. INC. |
ROCKLIN, CA |
| BASE BID + ALTERNATIVE A |
$1,271,325.64 |
|
|
| # 4 Bidder |
| TEICHERT CONSTRUCTION |
SACRAMENTO, CA |
| BASE BID + ALTERNATIVE A |
$1,366,302.45 |
|
|
| # 5 Bidder |
| THE BEEBE CORPORATION |
SACRAMENTO, CA |
| BASE BID + ALTERNATIVE A |
$1,398,895.35 |
|
|
| # 6 Bidder |
| MCGUIRE & HESTER |
OAKLAND, CA |
| BASE BID + ALTERNATIVE A |
$1,405,937.29 |
|
|
| # 7 Bidder |
| ODYSSEY LANDSCAPE CO., INC. |
STOCKTON, CA |
| BASE BID + ALTERNATIVE A |
$1,406,979.04 |
|
|
| # 8 Bidder |
| C & C CONSTRUCTION INC. |
ROCKLIN, CA |
| BASE BID + ALTERNATIVE A |
$1,451,272 |
|
|
| # 9 Bidder |
| VANGUARD CONSTRUCTION |
LIVERMORE, CA |
| BASE BID + ALTERNATIVE A |
$1,470,115.22 |
|
|
| # 10 Bidder |
| GRANITE CONSTRUCTION COMPANY |
WATSONVILLE, CA |
| BASE BID + ALTERNATIVE B |
$1,571,895.4 |
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| LANDSCAPE |
ASPEN LANDSCAPE |
ORANGEVALE, CA |
| SLURRY SEAL |
CPM |
SACRAMENTO, CA |
| STRIPING/MARKERS |
CENTERLINE |
ELK GROVE, CA |
| FENCING |
NORTH AMERICAN FENCE |
OAKLAND, CA |
| TRAFFIC SIGNALS |
RICHARD A. HEAPS ELEC |
SACRAMENTO, CA |
| SURVEYING |
BAUMBACK |
LODI, CA |
|
|
| Contract #3988 |
MCCLELLAN EDA GRANT PROJECT 2: SOUTH MCCLELLAN DISTRICT STREET IMPROVEMENTS |
|
Engineer's Estimate: $7,600,000 |
|
| Bidders for 3988 |
| Apparent Low Bidder |
| DESILVA GATES CONSTRUCTION, LP |
SACRAMENTO, CA |
| TOTAL BASE BID ROADWAY + BID ALTERNATIVE A |
$4,107,620.75 |
|
|
| # 2 Bidder |
| TEICHERT CONSTRUCTION |
SACRAMENTO,CA |
| TOTAL BASE BID ROADWAY + BID ALTERNATIVE A |
$4,119,962.9 |
|
|
| # 3 Bidder |
| SIERRA NATIONAL CONSTRUCTION, INC. DBA J R S GENERAL ENGINEERING |
CARMICHAEL, CA |
| TOTAL BASE BID ROADWAY + BID ALTERNATIVE A |
$4,356,993 |
|
|
| # 4 Bidder |
| MCGUIRE & HESTER |
OAKLAND, CA |
| TOTAL BASE BID ROADWAY + BID ALTERNATIVE A |
$4,504,695.8 |
|
|
| # 5 Bidder |
| SIERRA NEVADA CONSTRUCTION, INC. |
SPARKS, NV |
| TOTAL BASE BID ROADWAY + BID ALTERNATIVE A |
$4,988,007 |
|
|
| # 6 Bidder |
| GRANITE CONSTRUCTION COMPANY |
WATSONVILLE, CA |
| TOTAL BASE BID ROADWAY + BID ALTERNATIVE A |
$5,193,318.62 |
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| CLEARING |
AL'S LAND CLEARING |
SACRAMENTO, CA |
| CONCRETE |
MF MAHER |
VALLEJO, CA |
| ELECTRICAL |
RICHARD HEAPS ELECTRIC |
SACRAMENTO, CA |
| FENCING |
PISOR |
SACRAMENTO, CA |
| LANDSCAPING |
BADILLA LANDSCAPING |
BRENTWOOD, CA |
| LIME TREAT |
GRIFFIN SOIL |
PLEASANTON, CA |
| STRIPING & SIGNS |
CENTERLINE STRIPING |
ELK GROVE, CA |
| UNDERGROUND |
DA WOOD CONSTRUCTION |
MODESTO, CA |
|
|
| Bids Received on: 2008-03-13 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #3931 |
WALNUT GROVE SEWER PROJECT |
|
Engineer's Estimate: $16,800,000 |
|
| Bidders for 3931 |
| Apparent Low Bidder |
| MOUNTAIN CASCADE INC. |
LIVERMORE, CA |
|
|
|
| # 2 Bidder |
| RANGER PIPELINES INC. |
SAN FRANCISCO, CA |
|
|
|
| # 3 Bidder |
| SUNDT CONSTRUCTION, INC. |
NOVATO, CA |
|
|
|
| # 4 Bidder |
| TEICHERT CONSTRUCTION |
SACRAMENTO, CA |
|
|
|
| # 5 Bidder |
| MCGUIRE AND HESTER |
OAKLAND, CA |
|
|
|
| # 6 Bidder |
| FORD CONSTRUCTION CO., INC. |
LODI, CA |
|
|
|
| # 7 Bidder |
| PRESTON PIPELINES, INC. |
MILPITAS, CA |
|
|
|
| # 8 Bidder |
| ARGONAUT CONSTRUCTORS |
SANTA ROSA, CA |
|
|
|
| # 9 Bidder |
| TIDELANDS CONSTRUCTION COMPANY |
BRENTWOOD, CA |
|
|
|
| # 10 Bidder |
| MOZINGO CONSTRUCTION, INC. |
OAKDALE, CA |
|
|
|
| # 11 Bidder |
| GHILOTTI CONSTRUCTION CO., INC. |
SANTA ROSA, CA |
|
|
|
| # 12 Bidder |
| SIERRA NATIONAL CONSTRUCTION, INC. |
CARMICHAEL, CA |
|
|
|
|
|
| Sub's Listed by Apparent Low Bidder |
| Portion of Work |
Subcontractor |
Location |
| HDD |
LANNEY DIRECTIONAL DRILLING |
HUMBOLT, TX |
| ELECTRICAL |
AUBURN ELECTRIC |
SACRAMENTO, CA |
| BORE & JACK |
CENTERLINE BORING |
BAKERSFIELD, CA |
|
|
| Bids Received on: 2008-03-06 |
| All bids are taken under submission for review, evaluation and verification by the appropriate County project staff, and when necessary, by the County Counsel's office. |
| Contract #39090 |
WATT AVENUE/LIGHTRAIL TRANSIT GRADE SEPARATION |
|
Engineer's Estimate: $9,954,335 |
|
| Bidders for 39090 |
| Apparent Low Bidder |
| VIKING CONSTRUCTION COMPANY, INC. |
RANCHO CORDOVA, CA |
|
|
|
|