| Road/Lane |
When |
Details |
Contacts |
| North of American River |
American River Bike Trail at Hazel Avenue
| August 10 to December 31 24-Hour Continuous | Lane Closure ***Updated & Extended*** Bike Trail at Mile Marker 23. North Side of River: East side of Hazel Avenue the stairs will be closed to Bike/Pedestrian Traffic. The loop under the bridge to the West side of Hazel Avenue will be open. South Side of River: The bike trail under the American River Bridge at Hazel Avenue will be closed. Bikes/Pedestrians crossing Hazel Avenue will be detoured to Gold Country Blvd. Pedestrian access closed along North Bound Hazel Avenue between Gold Country Blvd. and Curragh Downs Drive. Bicycles share the road along Northbound Hazel Avenue. For more information on this detour, please visit www.Hazelavenue.org.
REASON FOR CLOSURE: Construct Retaining walls DISTRICT:5 More Info Map ID: 974, Updated: 11/6/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Pager: 916-828-3308 Mobile: 916-591-0047Onsite Contact: Kevin Sullivan Phone: 916-985-9462 Mobile: 916-531-1297 |
Elverta Road between Garden Highway and Powerline Road
| October 27 to November 25 7:00 AM to 5:30 PM | Road Closure The East and Westbound #1 Lane will have alternating lane closures. Flaggers will be present to control traffic. ALTERNATE ROUTE: Reigo Road. REASON FOR CLOSURE: Equipment crossing for Levee Construction
DISTRICT: 1 Map ID: 1039, Updated: 10/26/2009 | Media Contact: Dan Regan Phone: 916 -874-7056 Mobile: 916 - 591-0047Onsite Contact: Dave Koltun Phone: 916-875-2700 Mobile: 916-955-2887 |
** Fulton Avenue from Arden Way to Sierra Blvd and Munroe from Fair Oaks and Sierra Blvd.
| November 16 to December 4 7:00 PM to 6:00 AM | Lane Closure Fulton Avenue will have lanes 1 & 2 alternating closed in both the North and soutbound directions from Arden Way to Sierra Blvd. Also in the same area, Munroe Avenue between Fair Oaks Blvd, and Sierra Blvd. Suggest using Howe Avenue to avoid work zone. REASON FOR CLOSURE: Asphalt Concrete Base Repairs. DISTRICT:3 Map ID: 1045, Updated: 11/19/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Mobile: 916-591-0047Onsite Contact: Jeff Ternes Phone: 916-875-2700 Mobile: 916-539-0185 |
Marconi Avenue between Watt Avenue to Fulton Avenue
| June 28 to November 29 8:00 PM to 6:00 AM | Lane Closure Lanes #1 and #2 both east and westbound Marconi Avenue will be affected at various times between Watt Avenue and Fulton Avenue. All intersections along the way will be affected, motorists are encouraged to use El Camino as an alternate route around construction. At various times and dates the closure may carry over into the daylight hours. REASON FOR CLOSURE: New Water Main Installation. DISTRICT:3 Map ID: 972, Updated: 6/25/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Mobile: 916-591-0047Onsite Contact: Robert Harvey / Alyce Campos Phone: 916-875-2700 Mobile: 916-539-0629 / 916-591-0367 |
Multiple lane closures affecting various roadways (see details)
| July 31 to November 30 8AM to 3PM and 7PM to 6AM | Lane Closure Multiple lane closures affecting various roadways including El Camino Avenue, Howe Avenue, Maroni Avenue, Ethan Way, and Darwin Street. There will always be at least one lane of traffic open in both directions. Flaggers present where needed to assist motorists. REASON FOR CLOSURE: Installation of new water main. DISTRICT:3 Map ID: 1005, Updated: 7/31/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Mobile: 916-591-0047Onsite Contact: Alyce Campos Phone: 916-875-2700 Mobile: 916-591-0367 |
Oak Avenue between Melva Avenue and Menke Way
| September 9 to February 15 24-Hour Continuous | Lane Closure The Center Lane on Oak Avenue will be closed and the east and westbound lanes will be separated by the construction zone and concrete barriers. A detour will be provided to ease the traffic through the zone. REASON FOR CLOSURE: Installation of Sewer Pipeline. DISTRICT:4 Map ID: 1028, Updated: 9/17/2009 | Media Contact: Claudia Goss Phone: 916-876-6058 Mobile: 916-599-2417Onsite Contact: Steve Chavez Phone: 916-869-8989
|
| South of American River |
Bradshaw Road between Florin Road and Calvine Road
| March 26 to December 30 9:00 AM to 3:00 PM | Lane Closure ***EXTENDED*** There will be periodic lane closures on Bradshaw Road between Florin Road and Calvine Road. The lane closures will affect both north and southbound traffic, and flaggers will be present to assist motorists through the construction zone. REASON FOR CLOSURE: Relocation of utilities, and widening the roadway. DISTRICT:5 Map ID: 926, Updated: 11/2/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Mobile: 916-591-0047Onsite Contact: Russell Burch Phone: 916-875-2700 Mobile: 916-591-0026 |
Bradshaw Road between Florin Road and Calvine Road.
| August 30 to December 30 08:30 PM to 6:00 AM | Lane Closure ***EXTENDED*** Bradshaw Road will have various lane closures between Florin Road to the North and Calvine Road to the South. Flaggers will assist in areas that two lane, keeping one lane open at all times. REASON FOR CLOSURE: Installation of 48" water Main. DISTRICT:5 Map ID: 1019, Updated: 11/2/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Mobile: 916-591-0047Onsite Contact: Ed Thomas Phone: 916-875-2700 Mobile: 916-202-7842 |
E. Stockton Blvd, and Power Inn Road
| March 23 to November 19 9AM - 3PM / 8PM to 6AM | Lane Closure ***Extension***
Various lane closures will take place on E. Stockton Blvd, and Power Inn Road in both directions, keeping one lane open in each direction at all times. May also affect east and westbound Calvine at times. REASON FOR CLOSURE: Storm drain, sewer, water, frontage improvements, and Road restoration. DISTRICT:5 Map ID: 923, Updated: 7/14/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Mobile: 916-591-4700Onsite Contact: Jason Montoya Phone: 916-875-2700 Mobile: 916-202-1049 |
Elder Creek Road from Logan Street to Intersection of Cougar Drive
| November 2 to November 30 8:30 AM to 4:00 PM | Lane Closure The #1 Lane West bound Elder Creek Road from Logan Street to the intersection of Cougar Dr/Sunrise South Drive, will be closed. Also to affect the #1 Lane of southbound Cougar Drive. Flaggers will be present to assist motorists as needed. Suggest using 65th Street Expressway and Fruitridge Road to bypass work zone. REASON FOR CLOSURE: Need access to sewer manholes for cleaning. DISTRICT:2 Map ID: 1043, Updated: 10/28/2009 | Media Contact: Claudia Goss Phone: 916-876-6058 Mobile: 916-599-2417Onsite Contact: Mariano Tabbada Mobile: 916-599-3499 |
Gerber Road East of Power Inn Road and West of Wilbur Way
| November 16 to February 26 8:00 AM to 3:30 PM | Lane Closure Eastbound Gerber Road will have alternating lane closures east of Power Inn Road and West of Wilbur Way. there will be flaggers present to assist motorists through the Construction Zone. REASON FOR CLOSURE: Sewer, Drainage, Sidewalk, curb, gutter, Signals and Pavement restoration. DISTRICT:2 Map ID: 1051, Updated: 11/12/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Pager: 916-828-3308 Mobile: 916-591-0047Onsite Contact: Jason Montoya Phone: 916-875-2700 Mobile: 916-202-1049 |
Hazel Avenue between Curragh Downs and US 50
| August 17 to November 24 8:00 AM to 3:30 PM | Lane Closure ***EXTENSION***
Hazel Avenue will be closing Lane #2 North and Southbound. The inside left turn lane on Eastbound Gold Country will also be affected. One lane will remain open at all times. REASON FOR CLOSURE: Construction of Retaining Wall and Storm Drain DISTRICT: 4 Map ID: 1015, Updated: 10/28/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Mobile: 916-591-0047Onsite Contact: Kevin Sullivan Phone: 916-985-9462 Mobile: 916-531-1297 |
Keifer Blvd and South Port Drive
| November 10 to November 25 8:00 AM to 3:30 PM | Lane Closure The East and Westbound #2 Lane will be affected. Flaggers will be used to control traffic.
ALTERNATE ROUTE: Rosemont Drive. REASON FOR CLOSURE: Installing Handicap Ramps DISTRICT: 5 Map ID: 1050, Updated: 11/9/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Mobile: 916-591-0047Onsite Contact: Dale Cox Phone: 916-875-2700 Mobile: 916-202-4787 |
** Power Inn Road Between Stevenson Avenue and Calvine Road
| November 30 to December 11 7:00 PM to 6:00 AM | Lane Closure Power Inn Road will have the #1 and the #2 lanes closed alternating, in both the north and southbound directions keeping one lane open at all times. Suggest using Elk Grove-Florin Road or hwy 99 to avoid construction delays. REASON FOR CLOSURE: Asphalt Concrete Base repairs Map ID: 1046, Updated: 11/19/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Mobile: 916-591-0047Onsite Contact: Jeff Ternes Phone: 916-875-2700 Mobile: 916-591-0047 |
Riza Avenue @ Morrison Creek
| November 21 to November 23 24 Hour Continuous | Road Closure ***UPDATE*** Riza Avenue will be closed at Morrison Creek in both directions. The pedestrian Bridge will be closed to all pedestrians during the replacement of of the timber planks in the deck. Suggest using 47th Avenue as an alternate route. REASON FOR CLOSURE: Bridge Deck Replacement & Substructure Repairs. DISTRICT:5 Map ID: 1041, Updated: 11/6/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Mobile: 916-591-0047Onsite Contact: Eric Nickerson Phone: 916-875-5384 Mobile: 916-826-6441 |
** Sunrise Blvd Over-crossing the American River
| November 19 to November 24 8:30 AM to 3:30 PM | Lane Closure **** EXTENSION**** There will be alternating lane closures on the Sunrise Blvd bridge that overcross the American River in both the north and southbound directions. There will be flaggers there to assist in monitoring traffic through the work zone. Closures will be from Gold Contry Road to Fair Oaks Blvd. Suggest using Howe Avenue or Hazel during working hours. REASON FOR CLOSURE: Bridge Maintenance DISTRICT:5 Map ID: 1042, Updated: 11/19/2009 | Media Contact: Dan Regan Phone: 916-874-7056 Mobile: 916-591-0047Onsite Contact: Eric Nickerson Phone: 916-875-5384 Mobile: 916-826-6441 |